Figures
| Release | Reported | Consensus | Previous | Revised | |
|---|---|---|---|---|---|
| Construction Work Done (Q/Q) Q3 | 0.9% | 0.7% | -2.1% | — | Above |
As the wire published them. Above and below the consensus, in blue and orange: whether that is good or bad news depends on the reader’s position, so the page does not say.